play_arrow

keyboard_arrow_right

Listeners:

Top listeners:

skip_previous skip_next
00:00 00:00
playlist_play chevron_left
volume_up

Lesotho Highlands Water Project

4 Results / Page 1 of 1

Background

Africa

South Africa’s crucial water supplies from Lesotho: what the six-month shutdown means for industry, farming and residents

    By Ifedotun Aina, University of Cape Town   The main water supply to South Africa’s economic hub, greater Johannesburg in the Gauteng province, and to the country’s breadbasket in the Free State, is scheduled to be cut off for six months. Maintenance work on the 37 kilometre Lesotho Highlands Water Project tunnel is due to begin in October 2024. Ifedotun Victor Aina, a senior researcher at the Water […]

todayApril 8, 2024 21

Environment

Wildlife migratory “corridors” set to grow, Africa-wide

    By Bonface Orucho, bird story agency   Wildlife, particularly roaming species, exhibit remarkable mobility, covering vast distances in pursuit of essential resources such as water, grazing land, mates or favourable conditions like ideal calving sites. Estimates by the Tsavo Trust, a Kenyan conservation nonprofit, reveal that elephants within the Tsavo conservation area undertake daily journeys of between 50 and 150 kilometres, following distinct migration routes and pathways. In […]

todayApril 5, 2024 24

Africa

Kenya’s wildlife conservancies make old men rich, while making women and young people poorer

  By Joseph Ogutu, University of Hohenheim   Kenya once had an exceptional abundance and diversity of wildlife. But as the country’s population boomed, wildlife lost space to people, buildings, roads and agriculture. Since 1948, Kenya’s population has surged by 780%, from 5.4 million people to 47.6 million people in 2019. This was accompanied by a 70% drop in wildlife numbers, between 1977 and 2013. This massive loss of wildlife […]

todayApril 5, 2024 8

Environment

South Africa’s crucial water supplies from Lesotho: what the six-month shutdown means for industry, farming and residents

  By Ifedotun Aina, University of Cape Town   The main water supply to South Africa’s economic hub, greater Johannesburg in the Gauteng province, and to the country’s breadbasket in the Free State, is scheduled to be cut off for six months. Maintenance work on the 37 kilometre Lesotho Highlands Water Project tunnel is due to begin in October 2024. Ifedotun Victor Aina, a senior researcher at the Water and […]

todayApril 5, 2024 27

0%