play_arrow

keyboard_arrow_right

Listeners:

Top listeners:

skip_previous skip_next
00:00 00:00
playlist_play chevron_left
volume_up

Business / Economics

PowerCom Enhances Connectivity in Namibia

todayJune 11, 2024 11

Background
share close

PowerCom CEO, Beatus Amadhila announced plans to improve connectivity in Namibia by installing 80m guyed lattice towers in several regions. Two towers are already built, with more planned in Ikumwe, Nakabolelwa, Mutikitila, and additional locations. PowerCom aims to construct 29 towers at a cost of N$32.5 million in 2023/24, aiming to achieve 70% of this plan. These efforts will boost network capabilities and digital access across communities.

Written by: Leonard Witbeen

Rate it

Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *


0%